1.Crane before loading and unloading, the surrounding environment (including the determination of the loading and unloading area and the cleaning of the surrounding debris) and transportation path shall be confirmed first, the loading and unloading personnel shall strictly follow the safety loading and unloading rules and place warning devices.
2.Confirm the center of gravity of mechanical equipment, understand the stress of instant noodle machine and stick noodle equipment, and confirm the lifting position above the center of gravity.
3. The capacity of the safety rope used for loading and unloading must be greater than the weight of the equipment.
4.During loading, unloading and lifting, if there are overstocked parts of mechanical equipment (such as protective cover,etc.), please remove them in advance and mark the corresponding parts of the equipment, then reinstall the equipment after it falls to the ground.
5.When lifting, the part where the wire rope is in contact with the equipment must be padded with soft materials to prevent damage to the equipment.
6.Clean the site after the operation, remove all enclosures and warning signs.